PO Release strategy reset during the relase with all levels

HI Experts

We have 4 levels in PO Release strategy, suppose these are EX,MM,FH, and SB. When we do any change as increase quantity or rate during the release it does not go with previous level. Suppose EX ,and MM have released the PO but FH level increase quantity. Now it should reset and should go with first level EX. But it does not go, what are the changes required in release strategy so that during the release if any level do some changes it should go with first level.

After final release it is ok, if we do any change it go for release with first level.

Regards

Parkash Chand

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jan 23, 2014 at 06:14 AM

    Hi,

    As per my understanding change release indicator can modify in chngeble field option put 4 or 6


    rele.JPG (22.7 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 23, 2014 at 06:06 AM

    Hi,

    Sorry...I couldnt understand the business logic. Suppose your purchase manager change the PO quantity during release. In this case, should it again go to the buyer for release?. Will the purchase manager / business will wait till the lower lever release code release the PO?

    I would suggest to create a transaction variant for ME28 / ME29N which wont allow to change anything while release. Assign the variant to specified users. In this case, if anything to be changed in PO, it has to be done in ME22N only, which may re trigger release based on the release indicator changeability.

    Regards,

    AKPT

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 23, 2014 at 06:17 AM

    Do your release is with work flow, and the change in performed through ME22N

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.