cancel
Showing results for 
Search instead for 
Did you mean: 

Forecast (MP30) for materials - only integer

Former Member
0 Kudos

Hi,

Is it possible to run a forecast for a material (in tran. MP30) and force the system to result only integers?

Thanks.

Limor

Accepted Solutions (1)

Accepted Solutions (1)

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

Check the following information provided on note 813294:


You carry out material forecasts using Transactions MP30, MP38, MPBT or MM02. The system rounds up the forecast values by default. You can now use the MM_FCST_ROUND user parameter to change the rounding category contained in the standard.

To select the rounding category, maintain the user parameter with the following values.

o ' ' (no value maintained): The system rounds up as in the standard.

o 'K': The system always rounds up commercially.

o 'B': The system always rounds down.

BR

Caetano

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

The information provided on note 393320 is also relevant here:


A threshold-value exists for the rounding in the material forecast.The individual forecast values are only rounded if they are greater than the threshold value. In the standard system, the threshold is defined as 1 for Transactions MP30, MP38, MM02, MPBT or MP33.

Check the modification proposed on this note to change this threshold value.

BR

Caetano

Former Member
0 Kudos

Obrigado!

Answers (0)