Hi Gurus,
Can anyone share the procedure how to maintain sample drawing procedure and also how it should be assigned to Inspection plan for calculating the sample size. requirement is 0.5*sqrt( no of gr Qty) +1 the formula which needs to be addressed by using Sample drawing procedure. Sample should be calculated automatically once GR posted.
thanks
HI,
You have to Create Sample Drawing Procedure by QDP2, enter Size Factor as 1 & Maintain formula in Acc. to the formula field, in Std we can defined formula as ((square root of the number of containers + 1), FORMULA = TRUNC(SQRT(P2)+1). You can set your formula, press f1 help.
This Sampling Drawing Procedure maintained in Inspection Plan header with Inspection point as 200.
Sample Size: Create Sampling procedure by QDV1
You can set Fixed Sampling in Sampling type, Manual Valuation in Valuation mode & tick on Sample Management. Maintained Sample Size as per your requirement.
This Sampling Procedure is assigned to each MIC in Inspection Plan.
When you do GRN, Automatically Sample Size & physical Sample calculate.
Please Check this scenario in your Server....
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Warning.. please do some searches on sample drawing procedures and read the help files. Your question is very broad and general. This type of question has been asked many times.
Also, please complete your mission "Ready Set Go!" and "Be a Better Member". These really should be complete before you post anything.
Craig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
Sample drawing procedure can be created with the transaction code QPV2. You can define the formula their for the number of the sample calculation. The sample drawing procedure defined can be assigned in the Inspection plan header.
Please describe your requirement in detail, i may help you out.
Neeraj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks Neeraj for the Quick response.
have the following scenarios:
1. Sample Drawing: Formula is 0.5*sqrt( N) +1, N = Number of Drum for 01 inspection type
2. Per Production Order, two bags (3kg each) are sampled. One is sent to Chem lab and one for PSI (total of 6 kg) so in total 2X3 kg as sample. for 03 inspection type
3.Sample Drawing: 04 inspection type. out of whole qty
Sample 10 bottles (4- start, 3- mid and 3- end of production)
Pool sample of 6 g = Take 2 g of 4 bottles (start)+ 2 g of 3 bottles (mid) and 2 g of 3 bottles (end)
can you help on the above scenarios how to maintain the SDP & respective SP for this.
Hi ,
In addition to Rahul,
1. Define the Sample drawing procedure as said.
2. Create the sampling procedure - QDV1 { Fixed, Valuation as you required and Sample Management} , sample size as 2
3. Assign the Sampling procedure in Inspection plan header, Inspection point as 200.
4. Assign Sampling procedure with base sample Quantity as 3 KG.
Hope this should solve your case now.
Neeraj
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.