How to change status of a delivery document.

Hi Guruz,

I now have this issue, I want to change the status of the delivery document from "Being Processed" to "Completed"

Also simultaneously the MD04 MRP entry must be vanished.

Actually this delivery has a transfer order created to it and no PGI is done.

Thus system will no allow to delete the delivery now.

Can you please suggest how to clear this:

1) Change the status from Being processed to Completed forcefully but not via table entry.

2) Refresh MD04 and remove this delivery entry.

Thanks in-advance,

Kaushik

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jan 10, 2014 at 02:29 PM

    See SAP note 992587

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.