I have a requirement where :-

Retrieve all the open, completed/confirmed, aborted and cancelled Work Orders at different date ranges (-n/+n days from today) for different levels of asset as shown below

Asset Level

Going Back (-n)

Going Forward (+n)

Site

-1

+1

Process Group

-7

+7

Plant Group

-7

+7

Plant System

-30

+30

Plant Item (Equipment)

-30

+30


How should i configure this requirement for different levels of asset?

Can anyone please help me out.

Thanks and Regards,

Akshay Subbaraj

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member214626
Active Contributor
0 Kudos

Hi Akshay ,

The above requirement can be met using IW39 report assuming dates as basic start date . Also in std SAP there is no such status cancelled PM order etc. For this you can create user status at order header level .

For different levels of equipment you can just mention functional location of equipments or equipment no . Just check you business requirement suitability . If possible external no. range for equipments can also be used .

REgards

peter_atkin
Active Contributor
0 Kudos

Akshay Subbaraj

Create some IW39/IW49N variant for each of the requirements above.

In the variant you can set dynamic dates.