cost element from category 31

1) Is it mandatory in transaction OKG4 to assign to WIP , Reserves and COS/Revenue - cost element from category 31. I am asking as I see that I can assign cost elements from other categories too. Thanks Dan

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    Posted on Jan 08, 2014 at 05:14 PM

    Hi Dan

    Yes, WIP needs Catg 31 CE only.,.. Dont go by the fact that system is allowing you to enter anything else

    Br, Ajay M

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Hi Dan,

      That's exactly right you can assign other cost element category cost elements manually over there. But once you press F4 (select drop down) of either WIP or reserves or COS/revenue fields to select the cost elements, you see only 31 category cost elements.

      As Ajay Sir said, RA calculation always expects 31 cost element category cost elements only.

      Regards...

      Jose

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.