Skip to Content
author's profile photo Former Member
Former Member

How to create source system For BI?

Dear Experts,

We had restored the backup of one of our BI-Production system to the test system , with different SID.

It was successful.

Now for this test system the source system is still the source system for the Bi-prod system , but its not working properly.

Now we have one test system of R3 , we want the connectivity of the Test R3 system to the Test Bi- system.

Please guide us the procedure of it, so that we can initiate the process.

Thanks in advance.

Regards

Rj

Add a comment
10|10000 characters needed characters exceeded

Related questions

5 Answers

  • Posted on Jan 08, 2014 at 12:51 PM

    Please move your post to BW space.
    BI Platform space is fro Business Objects related discussions.

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 08, 2014 at 12:58 PM

    We have to change the logical system names once system copy has happend.

    So please perform the BDLS / BDLSS conversion in all clients to change the logical system names in all the tables.

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 08, 2014 at 01:02 PM

    Hi,

    Take basis team help. they can handle it. its basis activity.

    By using Tx - BDLS we can do logical mappings of source and target systems.

    if you search on Google you will get best pdf also.

    Use search term " Step by step on changing ecc bw".

    Thanks

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 08, 2014 at 01:37 PM

    Hi RJ,

    You do not need to change the logical system name in each of the flow/tables. Please follow the below steps:

    1. Delete Old existing RFC connection in SM59.
    2. Create New RFC connection.
    3. Create and map the existing logical system with the new logical source system using BDLS.
    4. Test the run and execute complete run.
    5. After that check the source system in BI and replicate all the data sources.

    Also you can follow the below decuments. All the steps are perfectly given for your queries.

    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/805eefcd-5428-2d10-c0ab-dc27a95b2c81?overridelayout=true

    Regards,

    Deb

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 08, 2014 at 01:50 PM

    Rajat,

    take help of BASIS, this is BASIS activity.

    If you want more info ... search in SCN or google "creation of source system ".

    Regards

    KP

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.