on 01-07-2014 11:24 PM
Hi,
We are trying to establish the high availability in our dual stack PI system 7.3 SPS7. The system is distributed installation where ASCS, DB, PAS and AAS are all on different servers and F5 distributes the load between PAS and AAS.
The issue right now is with the integration server configuration in the exchange profile and SLD (FYI, we are using local SLD for PI) where profile is.<cisysnr>.<cihost> is configured to use PAS. If PAS is down today, then the integration server is down and we have an outage. We have tried various solution including http://scn.sap.com/thread/1706862 with no success. Want to check if someone has the similar setup and can help us taking care of it.
Thanks in advance,
Pankaj
Hi Pankaj,
can you refer this links
http://scn.sap.com/docs/DOC-25207
http://www.scribd.com/doc/89978478/PI-7-3-EHP1-Troubleshooting-Guide
Regards
Nayeem
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Pankaj,
You need to configure the web dispatcher for load balance
Follow the below link for more details
http://help.sap.com/saphelp_nw73/helpdata/en/48/a9ba047e28674be10000000a421937/frameset.htm
With Regards
Ashutosh Chaturvedi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.