COSTING RUN: materials are exploded from plant which are not mentioned in SELECTION parameters

Hi Experts...

In costing run (CK40N), when I do structure explosion, system considering materials from other plant which is not mentioned at the time of selection. What would be the reasons?

For better understanding: consider the screen shots

Selection screen:

After structure explosion, you see the results as:

Please give me your valuable suggestions ASAP

Regards..

Jose

4_2.jpg (39.7 kB)
4_3.jpg (114.6 kB)
Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • Best Answer
    Posted on Jan 07, 2014 at 08:52 AM

    Dear Jose


    Have you analysed the error log issued at material selection level, some clue may be available there.


    Regards


    Rajneesh Saxena

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 07, 2014 at 08:05 AM

    Hi..

    Some of material for plant 1102 have the lower bom material which have ‘F’(external procurement) as procurement type and stock transfer(from 1101 palant) as special procurement in MRP2 view of material master as below picture.


    aa.png (13.7 kB)
    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi Big Choi,

      Thank you very much for your lightening replies.

      I sat along with PP consultant and checked the said transaction code, found no further solution.

      😊 Even I got the same doubt and no results found out.

      Regards...

      Jose

  • Posted on Jan 07, 2014 at 08:02 AM

    Hi

    is the material stock transferred from Plant 1101 to 1102? If yes, then that is the reason

    Br, Ajay M

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 07, 2014 at 12:39 PM

    Hi Ajay Sir, Rajaneesh Sir and Big Choi Sir

    I am so sorry that before posting query itself I have checked about special procurement key for transfer postings but I checked for the wrong plant. That's why I posted the query and was so adamant in my replies.

    I don't understand how would I make such a mistake. I hope it's out of over confidence.

    I am sorry my dear experts and Thanks a lot for your help




    Regards...

    Jose

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.