WBS Element - Infotype 27

Hi everyone,

I'm having an problem with IT 27: I need to know where (wich table) is it saved the information about WBS element because I have users that have an old Master Cost Center on IT27. when I create a new one on that IT, it appears the new one; but if I copy the values from the old one, it also takes the old Master Cost Center.

You got any idea about this?

Thanks a lot!

Sebastian.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    Posted on Jan 04, 2014 at 12:49 AM

    Hi Sebastian,

    your question doesn't make the problem very clear. You ask about WBS, but then describe the problem as being with the cost centre.

    I'll try to point you towards some solutions anyway.

    To begin with: all data in IT0027 is directly stored in PA0027 - I asume you know that, but just being safe.

    The master cost centre is stored in IT0001. The field "master cost centre" above the lines to capture different cost assignments in the IT0027 screen is display only and shows data from IT0001. So, no matter, whether you create or copy a record in IT0027, the master cost centre is not stored there. If you think it is displaying the wrong value, double check how periods of 0027 and 0001 oberlap. To have a cleab display, one 0027 record should never cover more than one 0001 record. It may also be a refresh issue. Leave the transaction and go back in to be sure. however: no matter what's dilayed in that field, the master cost centre at any given point in time is always determinded from IT0001. So, this display field in 0027 doesn't matter anywhere.

    This is completely different, if, for whatever reason, you capture the master cost centre in one of the lines in IT0027 and assign a percentage. Then it will never change automatically (assuming no BAdis or exits are used). One mistake made quite often is to capture a line with the residual percentage assigned to the master cost centre. This redundant information gets into your way, when the real master cost centre changes. It should not be done that way. The residual percentage of cost not assigned in any of the lines is automatically assigned to the master cost centre from IT0001.

    Hope any of this helps to clarify how it works.

    kind regards

    Sven

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Sven Ringling

      Hi Sven, I could find as you told me, everyone has been really helpful. I would like to know now: is it possible to download this PSP element from a lot of employees (massive way)? Do you know any way to do this?

      You have already helped me a lot, really thanks to all!

  • author's profile photo Former Member
    Former Member
    Posted on Jan 07, 2014 at 04:25 PM

    Hi everyone, I could doit by SE16N; in case anyone has the same problem! Thanks all of you!

    Add a comment
    10|10000 characters needed characters exceeded

    • What blocks you from doing it in SE16? If you pick the right columns to be displayed, you should be able to download the result list to a local file same way you can do it with any other report result list.

      Alternatively you can use query, but if you can't download for some reaaon (maybe authorisations), you'll probably face the same issue there.

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.