Multiple Creation of Control Recipe for a Phase

Hi Experts,

I created a Control Recipe for a phase in a process order. I completed the PI Sheet for that Control Recipe.

For that Phase the status came as CNF(Confirmed) PRFN(Processing Finished).

I tried to create a Control Recipe for the same phase. It is allowing to create multiple Control Recipes.

How to control the creation of multiple Control Recipe creation once the phase was confirmed.

Please help me.

Thanks in advance

Naren

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Jan 03, 2014 at 05:21 AM

    Hi Naren,

    You may want to consider this method.

    In T-cd:BS22, forbid business transaction CRCR(Create control recipe) for status PRFN(Processing Finished).

    However, this is MODIFICATION to standard system.

    Or we can wait to see if better way can be provided here.

    Best regards,

    Jessica

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.