Multiple Creation of Control Recipe for a Phase

Former Member
0 Kudos

Hi Experts,

I created a Control Recipe for a phase in a process order. I completed the PI Sheet for that Control Recipe.

For that Phase the status came as CNF(Confirmed) PRFN(Processing Finished).

I tried to create a Control Recipe for the same phase. It is allowing to create multiple Control Recipes.

How to control the creation of multiple Control Recipe creation once the phase was confirmed.

Please help me.

Thanks in advance

Naren

Accepted Solutions (0)

Answers (1)

Answers (1)

jessica_li
Advisor
Advisor
0 Kudos

Hi Naren,

    

You may want to consider this method.

In T-cd:BS22, forbid business transaction CRCR(Create control recipe) for status PRFN(Processing Finished).

    

However, this is MODIFICATION to standard system.

    

Or we can wait to see if better way can be provided here.

Best regards,

Jessica