Skip to Content
author's profile photo Former Member
Former Member

Doubt in installation, Please help me on this

Hello All,

Please help me on the below query.

1) We are creating a new quality system (QRD) on a new server by copy of production system (PRD) (disk to disk copy :flash copy) ---> Unix team and SAN team are going to do this.

2) once we created a new system (QRD) Please let me know the steps to change the SID(from PRD to QRD) on a new system.

3) Steps to change the hostname and SID in RFC

4) Do we need to run BDLS on New system.

Please let me know if i have missed any steps for the above task.

Regards

Subbu

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Jan 02, 2014 at 10:46 AM

    Follow below tool to change your SID...

    System Rename 1.0 tool (with screenshots)

    You should run the BDLS...

    There will be many RFCs in PRD which is pointing to live systems. You must findout these and change or delete if not required.

    There is a document on post system copy steps on marketplace and SDN.

    service.sap.com/instguides --> SAP NetWeaver --> select your installed version --> maintenance --> click on link system copy

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 02, 2014 at 11:38 AM

    Hi,

    As mentioned earlier you need to use system rename tool.

    Below is some of the information for system remane tool.

    http://scn.sap.com/docs/DOC-32851

    http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/e09aedab-8210-3010-ebb9-851e0c09c568?overridelayout=t…

    1619720 - System Rename for SAP Systems based on SAP NetWeaver

    1758658 [Int] System Rename for SAP Systems based on SAP NetWeaver


    Can you please let me know the Os that you are doing this system rename.

    Thanks

    Rishi Abrol

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 02, 2014 at 01:19 PM
    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Jan 02, 2014 at 01:26 PM

    Hello

    You need to do a homogeneous system copy.

    Are you going to do a flash copy of the database and SAP file systems ?

    In that case you will need to reconfigure all the symbolic links.

    If possible make use of the System Rename tool.

    If this is an Oracle database then you need to recreate the control files and the recovery of the database.

    You need to manually reconfigure all the RFC's with the correct host name.

    Yes you need to run BDLS for this.

    You will also need to install the license and configure the TMS.

    Regards

    RB

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.