Evaluations Tab in local control

Hello Experts,

In the Evaluations Tab of a local control, we are not able to view any of the results relating to control as shown in the screenshot (whereas Control Design/Effectiveness/Self assessment/Monitoring jobs are evaluated for the control)

Can any one suggest what could be the reason for this?

Regards,

Ramakrishna Chaitanya

pastedImage_0.png (25.4 kB)
Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • Best Answer
    Posted on Jan 02, 2014 at 10:46 AM

    Hi,

    Open the local control in the same timeframe as for which you have planned your assessment and then you can see the assessments and tests here.

    The evaluation tab only shows those evaluation which are done within that timeframe.

    Say you open a control in year 2013, then assessments and tests done for year 2013 or within that period will be shown.

    Regards,

    Smita.

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.