Skip to Content
author's profile photo Former Member
Former Member

ST5 for SOLMAN

Dear All,

I have to implement ST5 for our SOLMAN with current SP4.

I have downloaded all prerequisite packages and CTS Plugin.

CTS Plugin 200 implemented via SAINT.

Can you guide me further Thanks.

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • Best Answer
    Posted on Jan 02, 2014 at 07:13 AM

    Hi Srinivas,

    For upgrading your solution manager, use MOPZ to calcuate the stack.xml file and download all the files and move to EPS/in folder. Later, use SUM tool to upgrade to SP05 of solution manager.

    As you have downloaded all the per-requisite software components for SP05 you can even use SPAM for upgrade, which needs manual checks on each software components prerequisite which is time taking process and most of us use SUM tool only for upgrading purpose.

    regards

    kartik

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 02, 2014 at 07:01 AM

    Hi Srini,

    You mention ST5 implemented with current Sp04 ? mean SP05 upgraded? In solman ST component version is SAP solution manager version

    if you download all the file using stack in MOPZ, use SUM and upgrade the sp05.

    If SP05 stacked upgrade nas done, start system preparation and Basic configuration activities in solman_setup.

    Rg,

    karthik

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Karthik,

      Thanks for the Information.

      Present ST is 4 in our system.

      Now we are planning to upgrade other systems in our landscape TMS,GRC,EWM .

      So after upgrade finally i can do SOLMAN Upgrade, Because again doing system preperation and basic configuration may take time.

  • Posted on Jan 02, 2014 at 07:09 AM

    Hi Srini,

    I would rather suggest to upgrade to SP08 or SP10

    mainly SP08 is more stable version than SP05 because there you will end up applying 1000s of SAP notes for bugs etc

    SP10 as this is FP2 and will bring upon new features incase your customer is interested in solman than can plan for this

    In addition, if you upgrade to SP05 first then to SP08/SP10 efforts will be more so better upgrade directly to SP08/SP10 as per your case

    hope this helps

    Regards

    Prakhar

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Jan 02, 2014 at 07:36 AM

    Dear Srini,

    As prakhar says why you are going for sp05 only go for latest-1 always,

    Sorry i could,nt get your question properly before,

    Use SUM tool to upgrade ...

    Rableen

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.