on 12-31-2013 8:07 AM
Hi All,
Can you'll throw some light on conventional setup matrix; I understand that generation of a conventional setup matrix is based on the setup group that is manually created in R3/ERP .
I have 3 products(A,B,C) for which I have defined the 3 setup groups (A1,B1,C1) in R/3. I have maintained these setup groups in the recipes of the products and cifed the PDS across to APO (All the products have the same primary resource). I want to generate a conventional setup matrix but I am unable to figure out where do I define the setup times and setup costs and the sequence of the setup groups. Please help.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
The path and transaction code :
Advanced Planning and Optimization>Master Data> Application-Specific Master Data>Production Planning>/SAPAPO/CDPSC7 - Maintain Setup Matrix.
You can check the other options in Production Planning as general.
Hope that helps a little
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.