Hi Experts,

I have developed some application on sybase 2.1.3.Now, I have to move these application on SMP 2.3 on another machine.For this, I have import the workspace(Sybase 2.1.3) and copied it to another machine(which have SMP 2.3) workspace folder.Everything is fine but on data is not coming on triggering of event on emulater.


Whereas data is coming in MBO in which i have used an RFC for it.

Please give your valuable suggestion ASAP.

Thanks in advance

Warm regards,

Rohit

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

4 Answers

  • Best Answer
    Posted on Dec 26, 2013 at 07:17 AM

    Instead of copying the workspace itself, copy only the projects to the new workspace and import the project and try. The issue may be because of other reasons too. But make sure you imported the projects to new workspace properly.

    - Midhun VP

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 26, 2013 at 07:25 AM

    Hi,

    Did you checked the connection pool?

    Probably you may configured SAP details in Enterprise explorer of workspace, so you may get data in MBO. But have you checked the connection pool (SCC->localhost@localhost->domain->default->connections) ?

    If it is not configured properly, data will not reflect in device.

    Regards

    Yokesvaran Kumarasamy

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Dec 26, 2013 at 12:32 PM

    Hi

    I have faced same issue. But My Backend is MySQL. I have done following things.

    1. Created new project By importing SUP 2.1.3 project into SMP 2.3.

    2. MBO Properties-> change connection settings->(Given my new Backend connection).

    3. Close MBO Diagram.

    4.Open again MBO Diagram by clicking MBO(now MBO migration should happen from 2.1.3 to 2.3)

    5.Deploy your project into SMP 2.3 server

    6. Check with Native or Hybrid app.

    This should solve your problem also. If problem still persists let me know.

    Regards

    Srini

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Dec 26, 2013 at 07:27 AM

    Hi Rohit,

    copy the existing project in SUP 2.1.3 and paste it on another machine where you have installed SMP 2.3

    in new workspace of SMP 2.3,

    Either you can directly import the same project.

    OR

    1. create a new project File>New>Mobile Application project

    give same name as you had it in SUP 2.1.3

    2. Right click on the new project>import>File System

    3. browse the desired project>select all>finish

    4. deploy to new SMP 2.3 server

    Rgrds,

    Jitendra

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.