Stability Study

In stability Study how to link Maintenance Plan and Notifiation Number.

Please provide tables or FUnction modules

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

3 Answers

  • Dec 20, 2013 at 11:25 AM

    Hi Dinesh,

    Pls refer below details

    1.Create SS

    We need to start the Process of SS in SAP with the Initial Sample received.We do this by  creating Q.Notif. type QS ( with Material) or QR (w/o Material).

    2.Initial Test

    We have to carry out Initial test on the sample before we accept that we can take this forward for testing in future for Shelf Life Study.

    Initial Test would be like some test on charcteristic of Mat. A that would assure that the Material is actually Okay wrt what it is expected to be initially.

    3.Stabilty Planning

    Stability Planning defines future dates in which the Mat A needs to be tested in.It also defines the Storage condition in which the samples would be stored as per the test condition.What dates the Test will be carried out in future.

    4.Stabilty Test

    On all those dates as planned in future the Inspection Lot would be created automatically and we would need to record result and take UD to record if the tests are okay or not.

    5.Complete Stabilty Test

    After all those test dates are over, we need to clear the samples and close the SS.

    A notification can be created after lot creation.

    No.It can be creted w/o creating a lot.

    Remember SS is a diffeternt approach than conventional Inspection Planning. It is integrated with Qual. Notification to assist in the Process.

    how the stabllity study is monitored with the possible t-codes and mandatory entries for these t-codes please.

    It is fairly simple as once you create the Notification as detailed in Step 1, Action Box on the RHS would guide you on further steps.You need not worry about T codes here.Just create a Notification and it will guide you further.

    Further read on the Stability Study -

    [STABILITY STUDY|http://help.sap.com/saphelp_erp2005/helpdata/en/d2/7c9c3b566ac466e10000000a114084/frameset.htm]

    Reagrds,

    M.Arunkumar

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Dec 20, 2013 at 02:27 PM

    Hi Dinesh

    In CWBQM you can assign maintenance package to inspection plan.

    Then give this inspection plan details and start date cycle days in IP02 for maintenance plan. If you required share your mail ID i will send some doc about stability study.


    Regards

    kesava

    Add comment
    10|10000 characters needed characters exceeded

  • avatar image
    Former Member
    Dec 23, 2013 at 12:00 PM

    I think you guys have misunderstood my question. i am working on FS and i need a table where i get stability study maintainence plan number by entering notification Number