Hello experts,

I wish to perform allocation of costs from group of primary cost elements to single secondary cost element.

The cost center shouldn't be changed during the process.

How can I achieve this?

Thanks ahead,

Il Bilya

Accepted Solutions (1)

Accepted Solutions (1)

rajneesh_saxena
Active Contributor
0 Kudos

Hi

I think its not possible directly but we can play around. Allocate the cost element to some dummy cost center  and then through distribution (giving receiver CE as your Secondary CE) bring back to Original Cost center.

Regards

Rajneesh

jose_reddy
Contributor
0 Kudos

Hi Rajneesh....

Please correct if I am wrong and please check from your side also as I checked from my end...

The requirement is the cost from a group of primary cost elements to be moved to one secondary cost element with in the same cost center.

If it is yes, here the solution is....

Just use assessment cycle, where in you provide the sender and receiver as the same cost center, and obviously you need to provide the secondary cost element (with 42 category) and under the sender cost elements give the primary cost elements group.

I worked it on my system, results are positive

Regards...

Jose

Former Member
0 Kudos

Hi Jose,

Thank you for your reply.

I've tried your suggestion but after the assessment cycle completed, the secondary cost element remain in balance 0 (after debit and credit line posted from the cycle).

Does the  selection criteria for the tracing factor has anything to do with it?

Thank you,

Il Bilya

jose_reddy
Contributor
0 Kudos

Hi IL BILYA,

Yes, as you said I have also noticed that the Dr and Cr of secondary cost element happens, which leads to ZERO balance against that secondary cost elements since the sender and receiver cost center is same.

I don't think there will be any impact of tracing factor in this scenario.

For this issue there will be two alternatives:

  1. Two step solution: By this as Rajneesh sir suggested, consider a dummy cost center.
    1. First transfer the costs (primary cost elements) from the ORIGINAL COST CENTER to the dummy cost center using either re-posting method (KB61/KB11N) or use distribution cycle. When you do/run the allocation, system credits the original cost center and debits the dummy cost center.
    2. Once the value moved from original cost center to dummy cost center, create assessment cycle where in maintain dummy cost center as the sender and original cost center as the receiver. When you run assessment, system credits the dummy cost center and debits the original cost center. Finally you can see the original cost center posted with secondary cost element only, no primary cost element postings you see.

2. One step solution: Create assessment cycle with two segments. In the first segment, maintain original cost center as the sender and dummy cost center as the receiver with secondary cost element (assume 1000) and in the second segment, maintain dummy cost center as the sender and original cost center as the receiver with secondary cost element (assume 1001). When you run the assessment, system first reads the 1st segment, system debits the costs to dummy cost center and credits to original cost center and when it reads the second segment, it credits dummy cost center and debits original cost center. But in this case in original cost center, we see values like Dr. primary cost element costs, Dr. 1001 secondary cost element costs and Cr. 1000 secondary cost element costs.

@ Rajneesh sir: Seniority counts

Regards..

Jose

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi..

You can achieve your requirement using assessment cycle.

You create assessment cycle as below picture.

 

   Below is allocation result screen.

  

  

Former Member
0 Kudos

Hi  Big Choi,

Please see my answer to Jose earlier :

" I've tried your suggestion but after the assessment cycle completed, the secondary cost element remain in balance 0 (after debit and credit line posted from the cycle). "

Thank you for your help.