I am trying to start a custom workflow using an event I created ZBUS2009.blocked. I'm linked this event to the change document BANF using the object BUS2009 on change with field restriction eban-BLCKD. The event gets raised and a workflow starts. The issue is the item number on the requisition is not being passed to the event container. I've checked my bindings and I don't see any issues there.
I appreciate any input. Thank you.
I think this is because you have not done an entry in transaction SWED after doing a entry in transaction SWEC.
The key structures of BUS2009 and BANF are different. In one the structure is [Document Number][Item Number] and for other the structure is [Item Number][Document Number].
An entry is needed in SWED along with SWEC for the difference in key structure.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
I have tried to make the entries in SWED/SWEC but it is not working with BANF in SWED and BUS2009 in SWEC.
What is right structure for BUS2009? Thanks a lot, Carol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
10 | |
10 | |
9 | |
6 | |
6 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.