Mass BOM Change(Special procurement field)

Dear Experts,

How to Enter Special Procurement Field for Components of 1000 BOM's at a time, Please guide me.

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Posted on Dec 03, 2013 at 12:07 PM

    Hi,

    Use CEWB - Transaction to change BOM in MASS, follow the below steps to get your requirement done.

    - Select current work area as Header Change (SAP_BOM) or BOM item Level changes (SAP_ITEM )

    - On item tab select the component you want to replace & enter plant

    - Select LOAD BOMs & Task list icon.

    - System will load all the BOM's that have that item. If a BOM has multiple items with same component number , multiple lines of BOM are displayed.

    - Select the change (Pencil) icon on the screen

    - The component columns can now be changed. then insert the new component number for each of the BOM's.

    - Hit save icon.

    - System will display message work list saved.

    Refer Below Link for details.

    Starting a Mass Change (SAP Library - BOMs (PP-BD-BOM))

    Regards,

    Sakthivel SR

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.