on 10-14-2005 9:17 PM
I have a process chain in which I am using an InfoPackage to load data into 2 ODSs at the same time. I keep getting the following error in the 'UPDATE FROM PSA" process and the following are the messages:
-Job Started
-Step 001 started (program RSPROCESS, variant &0000000001438, user ID Z_R3USER)
-Performing check and potential update for status control table
-Specify valid date
-Job cancelled after system exception ERROR_MESSAGE
Can anyone tell me wht I can do?
Thank you for your input
Hi,
Have u checked the PC before the Scheduling, is it first time the chian is scheduled..?
Post the detail error message what u get in the monitor..
Regards-
Siddhu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Your update rule to one or both data targets may be
causing the load to fail. Check the logic in the routines.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Deep,
What is the processing option in your InfoPackage (tab page Processing)?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
10 | |
10 | |
9 | |
6 | |
6 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.