cancel
Showing results for 
Search instead for 
Did you mean: 

Update from PSA error in Process Chain

Former Member
0 Kudos

I have a process chain in which I am using an InfoPackage to load data into 2 ODSs at the same time. I keep getting the following error in the 'UPDATE FROM PSA" process and the following are the messages:

-Job Started

-Step 001 started (program RSPROCESS, variant &0000000001438, user ID Z_R3USER)

-Performing check and potential update for status control table

-Specify valid date

-Job cancelled after system exception ERROR_MESSAGE

Can anyone tell me wht I can do?

Thank you for your input

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

Have u checked the PC before the Scheduling, is it first time the chian is scheduled..?

Post the detail error message what u get in the monitor..

Regards-

Siddhu

Former Member
0 Kudos

Hi,

I was able to resolve this problem. It was not a problem with process chain, but was something to do with the data. The values for fiscalperiod were not in the right format.

Thank you all for your inputs.

Former Member
0 Kudos

Hi,

Your update rule to one or both data targets may be

causing the load to fail. Check the logic in the routines.

former_member188975
Active Contributor
0 Kudos

Hi Deep,

What is the processing option in your InfoPackage (tab page Processing)?