Skip to Content
0
Nov 24, 2013 at 12:46 PM

Cancellation issue

36 Views

Hi SAP Experts, please help in the below issue,

Remove from storage MvT 313 from storage loc 0001 to 0002, Quantity = 5 PC, Material doc number 100 generated

Cancel Material doc number 100 with MvT 314, Material doc number 101 generated

New transaction, Remove from storage MvT 313 from storage loc 0001 to 0002, Qnantity 25, Material doc number 102 generated

Place in storage with reference to material doc 100 (already cancelled) the system allow to receive from the cancelled material doc

But if i try to receive 25 PC from the last mat doc 102, the system allow only 20 PC

How can i prevent this action? i want to prevent receiving any quantity from the cancelled material doc (doc 100) and allow receiving of 25 PC from the last material doc (doc 102)

Thanks in advance