Skip to Content
0
Former Member
Nov 23, 2013 at 06:10 PM

Direct backflush in ECC from SAP ME

147 Views

Dear experts,

There is a need for us to to direct backflush of components in ECC from SAP ME.

That is, I do not maintain any floor stock for components in SAP ME. All the components are assigned to a particular operation. When this operation is confirmed, the system should be able to post a direct backflush in ECC.

My questions are:

In SAP ME: I believe there are controls / settings available in build tab of material as also relevant collaboration. Is this correct? Can I get details on this?

Is it possible to do so without having floor stock since GI will be posted directly in ECC.

Is it also possible to do a GI from WM managed storage location?

Would be thankful for you reply.

Regards,

Srinivas