cancel
Showing results for 
Search instead for 
Did you mean: 

SOP&CapPlanng_DOCUMENT Needed plz!!!!

Former Member
0 Kudos

Hi Experts,

Plz provide easy way step wise  doc about SOP & Capacity Planning (in ECC 6.0 onwards).

Thanks & Regards

MDS

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member184574
Active Contributor
0 Kudos

Hi,

Look at the following document on standard SOP with full flow with screen shots....

http://scn.sap.com/docs/DOC-50757

Hope this helps....

Thanks

Kumar

former_member184574
Active Contributor
0 Kudos

Hi,

Find the process flows in SOP.......

Standard SOP:

1.       Creation of Product group – MC84

2.       Create plan in inactive version – MC81

3.       Disaggregate product group plan – MC76

4.       Convert Inactive version to active version – MC78

5.       Transfer SOP plan to Demand management. – MC75.

FF  Flexible Planning :

Create info structure – MC21

Activate the info structure – MC22

Assigning the planning parameters to the info structure. – MC7F

Creation of Planning Hierarchy – MC61

Creation planning type and Macros- MC8A

Calculate Proportional Factors – MC9B

Planning in the planning table – MC93

Copy planning version - MC8V

Transfer planning data to demand management – MC90

Thanks

Kumar

Message was edited by: SCN Moderator

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

In order to activate the rough-cut capacity planning on SOP, you should check your settings for the "rough-cut scheduling" on transaction OPU4. Make sure that the flags 'scheduling' and 'generate capacity requirements' are checked. Generally, the standard selection ID 03 is used here.

After that, you should create a rough-cut planning profile on transaction MC35.

In order to check the capacity, on transaction MC88 go to menu "view" - "capacity situation" - "rough-cut planning" - "show".

BR

Caetano

Caetano
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello

Take a look on the following WIKI that I have created:

http://wiki.scn.sap.com/wiki/display/ERPMan/Rough-Cut+Capacity+Planning+on+SOP

BR

Caetano