validate WBS element in SAP ME during assembly

Jan 16, 2017 at 03:22 AM

28

avatar image

Hi all,

My customer assembles complex machines with a BOM having up to 7 levels of sub-assemblies.

A single sales order can result in >100 Production Orders.

All these Production Orders will have the same value in their WBS element.

SAP ECC will only accept consumption if the WBS element of the consuming PO is the same as the WBS element of the PO that produced the consumed sub-assembly.

However, the WBS element is not sent to SAP ME in the production order interface, so SAP ME cannot check the WBS element during assembly.

The result is, that the sub-assembly SFC can be assembled into the higher level SFC in SAP ME, but the yield confirmation interface with SAP ECC will fail.

Did anyone else encounter this same problem?

What is the vision of SAP on this situation?

Regards,

Hans Otzen

10 |10000 characters needed characters left characters exceeded
* Please Login or Register to Answer, Follow or Comment.

1 Answer

Sergiy Katerinich
Jan 25, 2017 at 09:57 AM
0

Hi,

It looks as if such scenario is not covered by the current design so there is no solution for you. You should address your question to SAP ME Product Management team.

Regards,

Sergiy