Hi Gurus,
I have scheduled a program to run every morning. Now I want to unschedule it, ie I do not want the program's job to run every morning. It is a little strange but I do not see anywhere , that I can remove this from schedule.
Can anyone advise me on how to stop this program?
Thanks,
Reddy