rrp3 order issue

former_member205751
Participant
0 Kudos

Hi

supposing i am planning order 5000 on july 1st   and  2000 on july 5th.....  so it makes an completed order of  6000 on 9 th july and 1000 on 10th july( so totally 7000)

now i want to know how it was split  ......where this 6000  precisely is coming from  how much from july 1st session and how much from july 5th session.

how do i find it....rrp3 is the most complicated place on earth.....where and how in rrp3 i find out.

thanks

Accepted Solutions (1)

Accepted Solutions (1)

ravi_malpani
Active Participant
0 Kudos

Please check the lot size method, minimum lot sie qty., max lot size and rounding value from product master in APO. The order quantities are a result of these settings

former_member205751
Participant
0 Kudos

well i wil do some study on your suggested inputs ....let me check  product master

Answers (2)

Answers (2)

Former Member
0 Kudos

RO,

For this purpose, //RRP3 is no different from MD04/MD05; which you already know.  Typically, the links between specific supply and demand elements are only logical and dynamic (can change at any time), unless you are talking about MTO or some other business condition that requires fixed pegging.

The advantage of //RRP3 is that there usually is a nice pegging structure to tell you which supply element is currently being planned to support which demand element.  Look at the 'Pegging Overview' tab to see the relationships.

Best Regards,

DB49

Former Member
0 Kudos

Order size (quantity) would depend on lot-size. You can check Product Master in RRP3 page itself. Go to "Lot Size" tab and within that tab "Procedure" and also "Quantity and Date Determination". These fields are of your interest. If you can share the values you see there, we can try to reconstruct and explain.

former_member205751
Participant
0 Kudos

thanks rahul i will do some R and D  on this specific tab contents