No costing variant exists in controlling scenario CPR1

Hi,

We are facing issues with Project Costing in cProjects. we are getting error "No costing variant exists in controlling scenario CPR1".

Costing variant is maintained in the Controlling CPR1 and other settings are looking fine. It would be great if someone can suggest the root cause for this issue.

Thanks in advance,

Prabu

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    avatar image
    Former Member
    Nov 12, 2013 at 05:30 PM

    Hi,

    I hope you have tied your controlling scenario with controlling area in next config step after defining controlling scenario. If you have done this already then please check whether costing variant is defined correctly (okkt).