Skip to Content
0
Nov 12, 2013 at 02:40 PM

New setup formula with field LOSGR

203 Views

Hi PP Experts,

We have a requirement to create new set-up formula for the setup as follows:

(operation qty/costing lot size) * Set-up time

Note: costing lot size (field LOSGR) from the 'costing view 1' in the same plant as the work center.

I tried adding field LOSGR in transaction OP7B, but I received an error "Entry LOSGR does not exist in TC22", then I added this field in table TC22 via SE16 and I could able to create a parameter then created a new setup formula with this parameter (with transaction OP21) and then I created a production order, but the system is not calculating the setup based on this formula, it's just showing the setup time maintained in the routing.

Please let me know is there any way with which we can create a new set up formula that works as per the required formula? also please let me know about any development if this is not possible with standard configuration?

Appreciate your response thank you.

Regards

Adnan Shaik