Skip to Content
author's profile photo Former Member
Former Member

Process Chains for delta update

hi,

i know we need a infopackage to start of. but the infopackage i have is a full update. can i create a process chain to have delta update for that same infopackage.

thanx in advance,

ravi.

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Oct 11, 2005 at 02:25 AM

    Hi,

    U can do it if it is a ODS , first init without data transfer, then make the repair request .

    RSSM_SET_REPAIR_FULL_FLAG

    Used to convert allfull requests for a data source into repair full request

    Refer oss note 689964

    It is better use another infopackage if it is cube.

    Regards

    Siddhu

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 14, 2005 at 12:30 PM

    Hi Ravi,

    Sid gave a very good suggestion. What is to be understood is that one of the features of the ODS is that we can have only Masterdata with out even having any transaction data(as it is a flat structure) try the method which Sid has suggested.

    Regards,

    Krishna Chaitanya

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.