Skip to Content
author's profile photo Former Member
Former Member

0Material Interval Hierarchy

I am having problems activating an Interval hierarchy for 0Material on the Q/A environment. It times out. For a temporary solution we have increased the time period from 1 hour to 4 hours to see if it will activate in the time. In the Development environment if activates in minutes. The Dev contains 600,000 records and Q/A 900,000 records.

We are having problems with loads from the R/3 Q/A source system. However, I do not see that having an impact since the activation should not have to hit the source just align with the 0Material. Is this correct and are there any possible tests solutions that anyone maybe aware of. Thanks

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • Best Answer
    Posted on Oct 10, 2005 at 12:30 PM

    Hi,

    I asume hardware on QA is equivalent to DEV ?

    Check if database stats are current on QA.

    If DB is ORA check PSAPTEMP IO performance. This is heavily utilized with change runs. Are there in QA large aggregates present which are probably empty in DEV (they need adjustment with change run an this is time consuming).

    Kind regards, Patrick Rieken

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.