Former Member
Nov 05, 2013 at 08:02 AM

Primary Cost Component Structure Activated, Split in PCC not correct

125 Views

Dear Friends,

I have created a primary cost component split using transaction OKTZ and have assigned the primary cost elmenst and assessment cost elements to the different cost component as required. Furtehr to this, I have assigned the secondry cost elements associated with the activities to one cost component group as technically required. I now run the cost centre planning, calculated activity rates and made the cost estimates using transaction CK11N. The Cost estimate so proposed by the system shows the composition of activity rates in differnt cost components as desired. But, when I do the production for the FG material that was costed the PCC shows only the cost component that contains original cost elemnets that are associated with the activity and is not showing the composition of the same.

Can anybody let me know if where I went wrong as I was especting the system to show the cost components in PCC as designed in OKTZ and as they are getting derived while costing the material.

Please let me know the same at the earliest.

Regards,

Anurag Gupta