Skip to Content
author's profile photo Former Member
Former Member

regd. change pointers and notifications

Hi,

The question might sound a little too broad.

But bear with me...Just give me a brief overview,

of how do I go about using change pointers....

Just correct me if I am wrong.

We create a change document object in the system, or use an existing one. About pointers I am not sure.

Then, through SPRO and ALE we activate the change pointer for some message type. then....??

Add a comment
10|10000 characters needed characters exceeded

Assigned Tags

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Oct 09, 2005 at 08:59 AM

    Hi,

    I haven't done this in a while, so please check my answer!

    1) You activate change pointers in general in one transaction (I think it was BD61, but I'm not sure)

    2) Then you activate them for certain master data (i. e. material, customer, ...) in another transaction which I don't recall atm.

    3) Every time one of those master data objects is changed, the system generates a "change pointer", which you can basically just think of as an entry in a transparent table, which includes the type and key of your master data object (such as e. g. the material number).

    4) You plan a background job which will go through those change pointers and which will generate a master IDoc (e. g. MATMASxx) for this data object. The change pointers are then reset (i. e. every item will only be sent once).

    5) Depending on your ALE customization this master IDoc will be sent to a remote system.

    You can refine this scenario using quite a bunch of different techniques. One of them is filtering (e. g. only materials with a certain material group, or based on classification etc.). Other options are reducing the Master IDoc, e. g. sending only relevant data instead of the whole master IDoc. There are even a few customer exits, if that doesn't suffice.

    Hope that helps (please reward me if it does)!

    Regards, Joerg

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member Former Member

      Hi,

      The report will process all IDocs that have a certain status and then send them.

      This is used in conjunction with the radio box "Collect IDocs / Transfer IDocs immediately" in the partner profile.

      However - the report is not really connected to the master data repliction you talked about in the previous post...

      Hope this helps (please reward me if it does...)

      Regards, Joerg

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.