Skip to Content
avatar image
Former Member

Role Usage Synchronization in GRC ERM 5.3

Hello,

when starting the Role Usage Synchronization in ERM for a production system the job does not run correctly.

Job history is not showing any error, but:

31 11/4/13 3:05:45 AM Ready Job created 31 11/4/13 3:06:23 AM Running Job running 31 11/4/13 3:06:23 AM Completed Job completed

The connector for the production system was created just before creating the job.

Is a re-start of ERM required before the sync job can be released? Is there any other setting missing?

For other, already available systems, the job ran correctly without issues.

We are on GRC 5.3 SP19.

Thanks,

Tanja

Add comment
10|10000 characters needed characters exceeded

  • Get RSS Feed

1 Answer

  • Best Answer
    avatar image
    Former Member
    Nov 05, 2013 at 12:13 PM

    Got the solution, forgot to run the initial load jobs in ERM

    • ORG Value Synch
    • Transaction Synch Job
    • Activity Synch Job
    Add comment
    10|10000 characters needed characters exceeded