cancel
Showing results for 
Search instead for 
Did you mean: 

Splitting shipment cost service entry into two line items

0 Kudos

I have two line items of different materials in delivery assigned to a TD shipment.The shipment cost is based on delivery line item and shipment cost item category & GL a/c for freight charges are the same.The requirement is to split the service entry into 2 line items as per freight cost for each material ( based on quantity) and post 2 FI documents. How can we achieve this ?

Accepted Solutions (0)

Answers (0)