Hi All,
We are at the stage where we have our last remaining records filled in the setup table on R/3. I want to verify the remaining steps.
1. Do we kick off a Delta Init Infopackage in BW, then schedule program RMBWV313 in R/3 to run nightly.
Doing this above, is this correct. Is the Delta queue now in sync? Is it absolutley mandatory that setup table be filled during off hours (nobody in system, even if billing documents are not updated)?
In LBWE in R/3 I clicked the job control link for VDITM and input parameters to kick off periodically (daily) at a particular time). I tested this in our Dev system and no job kicked off. Can someone explain how to specifically schedule this job periodically.
Thanks,