Skip to Content
author's profile photo Former Member
Former Member

BPEM processes from NetWeaver 7.3 in NetWeaver 7.31

Hi everyone,

we are in process of migration of our servers from version 7.3 SP07 to 7.31 SP08. The source codes of development components were copied between our development configurations using DTR tools (we performed exact 1:1 copy).

But when we try to edit a BPEM process, (created in NWDS 7.3 SP07) in our "new" NWDS 7.31 SP08, it introduces some weird errors - for example, after editing of a simple function that concatenates several strings, NWDS sets expiration time for a task to some invalid value that prevents the development component from building. When we remove the expiration time from the task, development component can be built again without error, however it is impossible to set the expiration time back - after clicking the checkbox, the UI just flashes, but no tab for expiration time appears.

I would like to ask if there is any recommended way of transport (or migration) for these BPEM processes created in NWDS 7.3 to new NWDS 7.31, which would allow us to edit these processes again without inconsistencies and strange errors.

I originally posted this question in BPEM place, but guys there recommended me to post it also here, as it might be connected with some NWDI/NWDS issue. The first advice we've tried was to check-out every single file in the affected development component, as the NWDS could have "forgotten" to check-out some important files, but this was no success, the error remains the same.

Thank you in advance and best regards,

Tomas Hansut

Add a comment
10|10000 characters needed characters exceeded

Related questions

2 Answers

  • Best Answer
    author's profile photo Former Member
    Former Member
    Posted on Jan 10, 2014 at 02:07 PM

    Hi everyone,

    SAP has fixed the problem in the most recent NWDS version (7.31 SP08 PAT0007), which has been recently released. I think they've released new patches also for the SP09 and SP10 (but I didn't try them).

    Best regards,

    Tomas

    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Oct 17, 2013 at 12:11 PM

    Hi Tomas,

    Are the SCAs used for the BPM process build of the same version as the new 7.31 SP08? Did you update the used SCs in the development configuration of NWDI?

    Best Regards

    Harald

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.