on 01-13-2017 7:15 AM
I see planned order with exception meassage 20.
Its not getting reduced when confirmation is done in REM scenario.
But if MRP is run its gone.
Is this beacuse of exception meassage ?
Exception message 20 means that the planned order is no longer relevant, possibly because the orignal requirement was deleted. Therefore, this planned order should be delted in the next MRP run.
regards,
Caetano
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
yes plus I missed planned reduction period in osp2