Skip to Content
author's profile photo Former Member
Former Member

Manual Planning Performance

Hi all,

I have a planning layout with a variable for navigation.

The variable is actually of type exit to determine authorized values.

When the value gets changed, it takes more than 20 seconds until the next Excel layout is ready for input.

UPC_DARK2 parameter UPF_VAR_BUFFER_ON is set (X).

Do we need to restart server so that settings take effect? What else can we do?

The details for the MP execution are as follows:

Runtime 23sec (net: 14) // Records: 3-5 (DEV)

BWRead: 0.28sec

MP Trans: 1.7sec

MP Start: 7.0sec

MP Dataput: 1.7 sec

MP Logsc: 0.4

Thanks & Best Regards,

Eric

Add a comment
10|10000 characters needed characters exceeded

Related questions

1 Answer

  • author's profile photo Former Member
    Former Member
    Posted on Oct 02, 2005 at 07:45 AM

    ...it helps to read the SAP Note, which is referenced in the SAP SEM Performance paper..

    Note 629775 provides the (correct) parameter name:

    VAR_BUFFER instead of UPF_VAR_BUFFER_ON.

    At least the first one now really speeds up the layout < 8sec.

    Are these 2 different parameters or is this a 'typo' in the SAP paper?

    Best Regards,

    Eric

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.