Skip to Content
0
Former Member
Sep 30, 2005 at 03:01 PM

InfoPackage

12 Views

I am carrying out some work in a Sandbox and have schedule a Full Repair Load. It has loaded into PSA but is taking time to load to the target. Since it is Sandbox, can I cancel the load and if so could someone outline the steps thanks