Vendor - Subcontractor - Customer Direct Shipping

Hi,

Need your expert advises on a small issue. The scenario goes like this

There's a vendor who manufactures the product after the order is placed by us. The vendor then directly ships to a subcontractor for some additional work and once the processing is done, the subcontractor ships directly to our end customer. The goods are not received by us physically at any point of time. We invoice the end customer upon goods receipt.

Could you guys kindly propose a method to track the above process on SAP in accurately keeping stock records to aid accurate invoicing.

Thanks in advance!

Add a comment
10|10000 characters needed characters exceeded

Related questions

4 Answers

  • Posted on Sep 24, 2013 at 07:02 AM

    Hi,

    You can use the standard third-party sales scenario, it will partially solve your problem. You will not be able to keep track of the stock & invoicing process between your vendor and its subcontractor, but it could be a starting point to find a way to accuratelly cover the process. If needed, you will find a lot of documentation on the third-party sales scenario - SAP Help or scn, as here

    https://scn.sap.com/message/8877098

    Kind regards,

    H.

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      Thank you Horatiu, just to clarify. We pay the subcontractor and the vendor directly. The only relationship between then is the vendor delivering stocks directly to subcontractor bypassing our DC.

  • Posted on Sep 24, 2013 at 07:15 AM

    Depends on if you place a PO on the sub-contract vendor or if that element is handled by the first vendor.

    If you place a PO on both vendors, then set the sub-contract vendor as the delivery address (item delivery address tab) on the first PO and select the SC vendor tick box. The second PO is standard sub-contract.

    Add a comment
    10|10000 characters needed characters exceeded

    • Here's the process flow:

      PO 1 to the supplier: Place a normal purchase order for the manufactured goods. In the delivery address tab, mark the SC vendor check box and put in your subcontractor vendor number. When the supplier has shipped goods to the subcontractor, do the GR. On GR of this PO, stock will come to subcontractor stock. Do your Invoice as usual. Process flow complete.

      Create a sales order for the final end product to the customer. Use item category TADS (this is available in EHP6). TADS is a combination of third party and subcontracting flows. This sales order will create a subcontracting PR (instead of normal PR). Have you usual subcontracting data/setup ready. The delivery address will be customer address, same as third party.

      Convert this subcontracting PR to a PO. We'll call this PO 2. Component stock is already available in you subcontractor stock as a result of GR against PO 1, so PGI is not needed. You can monitor this in ME2O or ME2ON.

      When you subcontractor ships the goods to the customer, and sends you a pack list, component consumption advice and invoice, do a GR against PO 2. Its a statistical GR and records the fact that goods have been sent to customer. Do you MIRO to pay off the subcontractor. Subcontracting process flow complete.

      Now invoice the customer against the sales order. Sales process complete.

      This is a standard way and you have traceability all the way through and at each stage.

      Thanks,

      Saurav.

  • Posted on Sep 24, 2013 at 02:54 PM

    Your Scenario has two parts:

    1- PO for Components ( which are to be shipped directly to the Subcontractor) .

    Here in your PO Line Item, under delivery address tab, you need to specify the subcontracting vendor code and also tick "SC vendor".

    At time of MIGO, system will automatically post this to Subcontractors stocks with Mvt typ 101-O.

    2nd PartL : 3rd party subcontracting (for the Main Header material) :

    This is a new functionality available in Ecc 6.0 EHP5, for which you have to activate a Business function in LOG_MM_OM_2: Third-Party Order Processing for Subcontracting (New) ( RELNMM_605_LOGMMOM2_DS ).

    you can find more info here on http://www.consolut.com/en/s/sap-ides-access/d/s/doc/YP-RELNMM_605_LOGMMOM2_DS .

    You need to activate a business function, and create new Item category assignments in Sales .(Saurav has described the steps in the above post well)

    Please note that in this process, a Goods receipt (although statistical) is Mandatory for the consumption of the components at the vendor location.

    Note:

    There is also a Document on SDN wiki, by someone who has mapped "direct subcontracting" process in earlier SAP versions by configuration alone : http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/d0dbde93-6fa4-2c10-edb9-e477fa85b232?QuickLink=index&overridelayout=true&45518063861198


    Subcon ship.PNG (26.9 kB)
    Add a comment
    10|10000 characters needed characters exceeded

  • author's profile photo Former Member
    Former Member
    Posted on Sep 25, 2013 at 09:51 AM

    Hi,

    You can do it on purchase order using delivery address tab.

    But for customer you have to do PGI.

    Thanks

    Dibyendu Patra

    Add a comment
    10|10000 characters needed characters exceeded

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.