on 09-21-2013 3:48 PM
How does SRM maintain synchronization with the back end R/3 system ?
Hi Abhishek,
Refer to the examples in the link below.
https://scn.sap.com/thread/3315885
http://wiki.scn.sap.com/wiki/display/SRM/Currency+integration+between+SRM+and+ECC
Hope this helps.
Regards,
Deepak Kori
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Communication between SRM and ERP happens through RFC connections.
Thanks
Sunny
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
84 | |
25 | |
12 | |
9 | |
6 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.