Hi All,

Apart from PDP config, is it possible to procure direct material in SRM? How it is configured in SRM?

Please advice.

Thanks,

Sunil

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

There is a radio button : "Order as Direct Material" which indicate that this is a direct procurement.

Former Member
0 Kudos

Hi,

Why the account assignment information is not maintained when we order Direct material?

Thanks,

Sunil

Former Member
0 Kudos

Hi Sunil,

You can do Direct procurement in SRM, at the time of creating a SC , you need to select the check box "Direct Procurement".

Account assignment is used only for the materials which are direclty going to be consumed and you dont track the stock of those materials. This is indirect procurement.

Direct procurement materials will always be in a Stock (inventorized) and thus you dont have Account assignment tab. Also the goods recepient will be replaced by the Plant address.

Best Regards,

Anil

Former Member
0 Kudos

Hi Anil,

Thanks for the clarification.

While we order material as direct procurement, we need to assign source of supply so how billing will take place for that vendor if there is no account assignment?

Thanks,

Sunil

Former Member
0 Kudos

Hi Sunil,

In direct procurement, materails will come into stock. The payment (invoice) to vendor will be done in a normal way. You can do the invoice either in SRM or MM depending on your set up.

After the materails are in stock they can be issued to Production or Consumption against account assignment.

Best Regards,

Anil

Former Member
0 Kudos

Hi Anil,

As you said, "After the materails are in stock they can be issued to Production or Consumption against account assignment." Please let me know how this could be done. I think this will clear my point.

Thanks,

Sunil

Former Member
0 Kudos

Hi Sunil,

In Classic Scenario :

when you have materials in stock and you create a SC, a reservation will be created. Also you need to activate stock availability check. and than you can issue the materials in MM against any consumption movement type. You use transaction MB1A for issuing the material in MM.

In Extended Classic Scenario:

You cannot create Reservation. So goods issue will be done in MM only.

Hope this clarifies your doubt.

Best Regards,

Anil

Former Member
0 Kudos

In Classic Scenario, the reservation will be created in MM, right?

Will be the MRP available when creating the direct material SC or PO in SRM ? or depending on the scenario?

Regards,

Lin.

Former Member
0 Kudos

Hi Lin Wu,

Yes in Classic scenario, Reservation will be created in MM.

It depends on the business scenario, The PR can be created via MRP or Manual in ECC. This PR in turn if matches the transfer criteria it will come to SRM and there you can create SC or PO.

Best Regards,

Anil

Former Member
0 Kudos

Thank you very much for your reply.

Do you know how to config the PO type in the Classic scenario ?

When I click on creat PO in SRM, the PO will be created in backend, while how can I config the PO type ?

Regards,

Lin

Former Member
0 Kudos

Hi Lin Wu,

Config of PO is same for classic. Few things you need to configure.

Define objects in backend system, Number range in SRM and ECC. Doc type attribute -BSA in PPOMA_BBP

Best Regards,

Anil

Answers (1)