Hi Experts,

We have SRM 7.0. and Classic scenario. We are uploading PR's From ECC to SRM. by using FM: BBP_EXTREQ_TRANSFER.

When we tried to upload the PR's in SRM Development system, all are uploaded without any error. Similarly with test ECC system.

Recently we have copied production ECC system to ECC test System. After this we are getting strange error while uploading PR's. PR's uploaded successfully but failed in outbound que of ECC test system with error " Error when opening an RFC connection (CPIC-CALL:.. '' It has taken wrong RFC destination which is pointing towards SRM Production System. But when we debugged the Upload programm and fucntion module it is showing right RFC only. We have cross checked with system config for PDP, evrything is fine with correct profile and destination system. Please some one help me to find out the issue.

Early reply will be awarded with good points.

Thanks in Advance.

BR,

Basu

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Did you check your table V_T160PR ? There is logical system there.

Regards,

Lin

Former Member
0 Kudos

Hi Lin,

Thanks for your reply,

We have maintained correct logical system in table V_T160PR, While debugging it has taken proper RFC destination. But its failed in ECC outbound que and showing production system RFC in destination.

It was working earlier, after client copy from production we are facing this issue. Kindly suggest.

Br,

Basu

Former Member
0 Kudos

Hi Basu,

We had a similar issue last week with the CPIC-CALL.  This ended up not being an issue here internally with anything we changed.  This issue was with the company that host and maintains our SAP system servers.  Once they fixed their end then everything was fine.

Thanks,

Jeff