We have a requirement to use the exit EXIT_SAPLUPC_SERVICES_002 and Include ZXSEMBPSU02 which comes out of it. The Exit has been assigned to a project, and both exit and project are active.
To analyze the contents of what is being passed to it, I've put a breakpoint into the Exit that will always be hit [break username.] I've even put an infinite loop in place to stop the processing so I can look at it in the debugger. So far as I can tell the Exit isn't being touched, since the break and the loop are both ignored when I run an appropriate layout in the planning area. What else needs to be done for this Exit to be 'fully' active.
I've missed something obviously, but what ?
Thanks
Brent Mawhinney