Delete product cost collector for a material

sandeep_praharaj
Contributor
0 Kudos

HI  Sap Guru

I  want to delete product cost collector for a material can any body guide me the steps how to delete

    bcoz my existing pcc has been desighned withonly  production version. i want to make it routing production version.

pls any body help me

  Thanks & Regards

Sandeep Kumar Praharaj

Accepted Solutions (1)

Accepted Solutions (1)

rajneesh_saxena
Active Contributor
0 Kudos

Dear Sandeep

I could not get your query fully. What do you want. I mean when you say " pcc has been desighned withonly  production version. i want to make it routing production version" i could not get it. According to my knowledge production version is created with the combination of BOM and routing so what do you mean that you want to create PCC  with routing production version.

Any ways if you want to set deletion flag to your PCC go to KKF6N (for individual)/KKF6M (for collective) give material number etc. then from main menu go to edit and under it deletion flag-set.

Regards

Rajneesh Saxena

sandeep_praharaj
Contributor
0 Kudos

Thanks Rajneesh for your Answer,

 

        i  have puted the deletion flag to pcc & pcc has been deleted . after that whwn i am creating new pcc for material . it is defaultly selecting production version not routing bom see attached screen shot.

Thanks & Regards

Sandeep Kumar Praharaj

rajneesh_saxena
Active Contributor
0 Kudos

Dear Sandeep

As you have created production versions so it is so.

Regards

Rajneesh Saxena

sandeep_praharaj
Contributor
0 Kudos

Thanks Rajneesh

i have deleted the production version & pcc what ever associated prevoiusly. i am creating with new production version  repetative manfacturing profile allowed & attaching rate routing to it .  than creating pcc for the material.

Thanks & Regards

Sandeep Kumar Praharaj

Anupam1143
Active Contributor
0 Kudos

Hi

After marking PCC for deletion , you need to edit the controlling level of material through t code

CKMLMV_CA from Production version to BOM/routing for the material.After unlocking the same , you will be able to create the new PCC with desired Controlling level.

Check and revert.

Regards,

Anupam Sharma

sandeep_praharaj
Contributor
0 Kudos

Hi anupam thanks for your rply,

     In CKMLMV_CA it is showing as locked .attaching screen shot.pls help me how to unlock it so that i can make it bom/routing

Thanks & Regards

Sandeep Kumar Praharaj

Anupam1143
Active Contributor
0 Kudos

Hi

You need to unlock it first by archiving the PCC assigned to Production version  through T code KOAR or  SARA with Object  CO_ORDER   by giving the order no of PCC and then click on Edit controlling area the below Pop up will come for changing the controling level.The controlling level will unlock only when all dependecies are removed.

Regards,

Anupam Sharma

Message was edited by: Anupam Sharma

sandeep_praharaj
Contributor
0 Kudos

Thanks Anupam for your answer

can you help me with steps how to archive that order because i am unable find the steps archiving the PCC assigned to Production version .

pls help me

Thanks & Regards

Sandeep Kumar Praharaj

dejoy
Active Contributor
0 Kudos

Hello sandeep,

for PCC archiving you can use standard report- RKODEL01  in SAP.Check documentaion of this report if is it suitable for you or not.Excerpt from the documentation.

Deletion of product cost collectors

You can also use this program to delete product cost collectors (order type 05). However, data incostistencies may occur due to the associated production and process orders. Therefore, you can only delete a product cost collector once the associated production and process orders have been archived or deleted, or at least until the deletion flag indicator was set.

To set the deletion indicator for production or process orders, you can use the preprocessing program for the relevant archiving object (PP_ORDER or PR_ORDER)

          Though personally i have not used it.

Regards,

Anupam1143
Active Contributor
0 Kudos

Hi Sandeep,

Follow below step by step in KOAR:

 

- Press Preparation

- Enter variant name, press button variant

- Enter PCC, controlling area, flag the field deletion indicator and

remove flag test run

- Save attributes, enter name in description field

- Save again

- Press start date, press immediate, Save

- Enter Spool parameters

- Press execute

Check and revert.

Regards,

Anupam Sharma

sandeep_praharaj
Contributor
0 Kudos

thanks anupam ,deejoy for your answer both solutions are working fine i have changed the controlling level sucessfully . awards rewarded

so closing te thread

Thanks & regards

Sandeep Praharaj

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

Can you give the detail to unlock the production lock in CKMLMV_CA..

I have tried the process in KOAR but still could not make the change the control level..

Kamal

Answers (0)