Ehancement for order operation SPLT

hi all

who can give me a suggestion for above.

when i use cost collecter in the production order , i can spilt the order quantity on the operation ,and the same time automactive create an new order from this operation , with the quantity i had split.

and now , this operation maybe is use outside process, when i split the operation maybe the outside process PR already change to PurchaseOrder ,

so i want control if the PO exist, the operation can`t been split.

Add a comment
10|10000 characters needed characters exceeded

Related questions

3 Answers

  • author's profile photo Former Member
    Former Member
    Posted on Sep 09, 2013 at 06:33 AM

    nobody meet this problem? nobdy can help me?

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 11, 2013 at 09:23 AM

    Hi

    Please check these note for your requirements170819,449985.and 1106094.

    Regards,

    Anupam Sharma

    Message was edited by: Anupam Sharma

    Add a comment
    10|10000 characters needed characters exceeded

  • Posted on Sep 11, 2013 at 09:37 AM

    Hi Levies,

    You can so this with BAdi WORKORDER_UPDATE method AT_SAVE with custom error message if PO exit split not possible.

    Regards,

    R.Brahmankar

    Add a comment
    10|10000 characters needed characters exceeded

    • Former Member

      hi Rupesh

      tks so much!

      i will have a try!

      but i meet another problem,

      i want fetch the order (initial) quntity when i discreate t his order;

      such as i create an production order with quantity 70, then i discreate it into another

      order with quantity 15; so the initail order quantity must be 55(=70-15);

      when i display the order field [total quantity] is still 70; and the [short/Exc.Rcpt] quantity is 15;

      after i confirm the order with some scrap quantity 30,

      this field will become 45;

      so where can i calc the quantity for this order ;

      20130914155447.png (18.9 kB)
      20130914.png (16.1 kB)

Before answering

You should only submit an answer when you are proposing a solution to the poster's problem. If you want the poster to clarify the question or provide more information, please leave a comment instead, requesting additional details. When answering, please include specifics, such as step-by-step instructions, context for the solution, and links to useful resources. Also, please make sure that you answer complies with our Rules of Engagement.
You must be Logged in to submit an answer.

Up to 10 attachments (including images) can be used with a maximum of 1.0 MB each and 10.5 MB total.