on 09-05-2013 6:11 AM
Hello!
I have some problem.
We have FIM and it works fine,
but yesterday I have installed new FIM(10, sp7), and when I'm greating job (source FC), dimension source cannot load some columns.
example column TO - tech.orig load in this FIM:
And dosn't load same column in this FIM(not working):
What may be wrong?
Hello Daulet,
You should not create mapping to these dimensions, as they have specific meanings.
For example, Technical Origin
-524270 (= ORIG07-03, Package schedule - Imported)
-524271 (= ORIG07-02, Package schedule - Calculated)
If you mapped to -524271, an imported amount would actually be classed as 'calculated', which can lead to some very strange and unexpected behavior in the system.
Just like you cannot enter these dimensions in an input schedule, you should let the system determine these values.
Thanks
Marc
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello Daulet,
Mapping BFC technical dimensions may prevent drill to origin to work properly (sap note 1896749).
Not having the TO, GO or the ORU dimensions is not shocking me.
Can you explain wich version is "working" ?
Regards,
Matthieu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.