Skip to Content
0
Former Member
Sep 02, 2013 at 01:03 PM

A2EEFINB_TR 032 No suitable RFC destination could be found"001"

1097 Views

Hi,

In processing upgrade to EHP6, we are facing a problem after phase MAIN_NEWBAS/XPRAS_AIMMRG during Execution phase:

Checks after phase MAIN_NEWBAS/XPRAS_AIMMRG were negative!

Last error code set: Detected 38 errors summarized in 'XPRASUPG.ELG'<br/> Calling '/usr/sap/SID/SYS/exe/run/tp' failed with return code 8, check /usr/sap/SID/SUM/abap/log/SAPup.ECO for details

In the logfile

/usr/sap/CH7/SUM/abap/log/SAPR731XPRA90000113.SID

we can see the following:

A2 EFINB_TR 097 Transport tool FINBASIS: Client cascade for client "001" started

A2EEFINB_TR 042 RFC error with destination "CH7_001" -> see long text"Upgrade runs - No login""possible"

A2EEFINB_TR 032 No suitable RFC destination could be found"001"

A2 EFINB_TR 098 Transport tool FINBASIS: Client cascade for client "001" finished

The RFC destination exists indeed, but the connection isn't possible because of the upgrade (No login possible).

Now the upgrade was stopped because this phase needs a working RFC destination. And the RFC Communication can't work because no login is possible due to upgrade.

How to solve this dilemma?

Many thanks

Regards