cancel
Showing results for 
Search instead for 
Did you mean: 

Prepack concept in EWM

Former Member
0 Kudos

Helo gurus,

We're thinking of using prepack concept in our sap erp retail system, but i'm wondering on how things are going to work on ewm. We need to control stock at component level in our distribution center. But the PO's are going to be created for the prepack. If a inbound delivery is created for the prepack on erp, how the system will distribute this inbound to ewm? Is there a way to only manage the components in ewm and after the goods receipt the system explode the prepack on erp (mov.type 101 & 319)?

Thanks in advance.

Felipe Tripodi

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member209095
Contributor
0 Kudos

Hello Felipe,

You shall not have problems with EWM for structured materials. Mvt 319 & 320 are compatible with EWM, they create outbound delivery and posted automatically. If you create inbound delivery for structured mat, then GR will be done for that. Then you may run job process for splitting before putaway. You need to send both material master via CIF.

Best regards

Serhan